ABM Logo
ABM Engineering
Pulse Air System Installation
Back to Projects
IndustrialAutomationInstallation

Pulse Air System Installation

ClientBPCL – LOBP, Rasayni
LocationRasayni, Mumbai, India

Project Overview

To optimize the mixing and storage of finished petroleum products, we installed an advanced Pulse Air System. This technology replaces mechanical mixers, using compressed air pulses to agitate liquids. Our scope included the installation of air receiver tanks, control panels, and the intricate stainless steel injection piping inside the storage tanks.
50%
Energy Saving
Zero
Maintenance

Visual Gallery

Pulse Air System Installation Gallery 1
Pulse Air System Installation Gallery 2
Pulse Air System Installation Gallery 3

Key Challenges

  • Confined space entry requirements for tank internal works.
  • Precision calibration of air pulse timing sequences.
  • Ensuring absolute cleanliness to prevent product contamination.

Our Solution

  • Automated pulse control systems for consistent mixing.
  • Non-intrusive installation techniques to preserve tank integrity.
  • Rigorous chemical cleaning and passivation protocols.

Result & Impact

"50% reduction in energy costs compared to mechanical mixers and improved product homogeneity."